The anchor line, or chafing chain, is secured to which part of the anchor?

Prepare for the Boat Crewman Test with flashcards and multiple choice questions, complete with hints and explanations for each question. Ace your exam!

Multiple Choice

The anchor line, or chafing chain, is secured to which part of the anchor?

Explanation:
The rode is secured to the shank. The shank is the main structural member of the anchor that takes the pull from the line or chain, so attaching the rode here provides a strong, central load path and helps keep the anchor oriented correctly as it sets. Attaching to the crown would place load on a curved, less robust area and could cause the anchor to twist or not set properly. Attaching to the fluke would interfere with the digging blade and could damage it or hinder holding power. The stock (where present) isn’t used for securing the rode and is more about orientation than load-bearing.

The rode is secured to the shank. The shank is the main structural member of the anchor that takes the pull from the line or chain, so attaching the rode here provides a strong, central load path and helps keep the anchor oriented correctly as it sets.

Attaching to the crown would place load on a curved, less robust area and could cause the anchor to twist or not set properly. Attaching to the fluke would interfere with the digging blade and could damage it or hinder holding power. The stock (where present) isn’t used for securing the rode and is more about orientation than load-bearing.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy